Friday 23 May 2014

Well! Now we have steel!  Had sheduled it to put up on Saturday but got a head start today, with a big hand from Barrie  there are now 3 columns up and a horizontal.
Have lined up the troops for Saturday 10.30. To lift the big horizontals from the front garden to the back. Once they are round the hope is to hoist them up with a block and tackle strung between 2 scaffold towers.
The kids are enjoying the scaffolding too!

much care is needed with sizes, the holes in the base plates are 20mm, the resin anchor studs are 16mm and the holes into which the resin goes 18mm! Not much room for error!


Hope to post tomorrow "steel up!"

No comments:

Post a Comment