Friday, 25 April 2014

Not a lot of progress the last week or so. Been stripping rough cast off wall which will be inside the garage and the new upstairs bedroom. It is a lot of work to save 20mm! It will however make jobs like fitting the walltie strip and cutting in floor joists easier.
Latest dicussion on insulation is a departure from the 100mm full cavity fill, building control were not too happy with it. The new system is 75mm insulation held against inside wall with a 25 mm gap to the outsidevwall. Down side is will need to use insulated plaster board to get full u value, so that will offset the 20mm gained by stripping the rough cast! Will revist the possibility of taking down the outside skin of the old wall at least in part in the new bed room.
photos below show current position. Todays work doesn't look much but the verticle dpc at the front between old and new is mostly cut, just waiting for a loan of Derek's saw, mine is a Sthill and cuts about 5mm short of a full brick! Also the 2 front corners are well up and some bricks are set on the outside wall to string between and fill in. I am reluctant to go much higher with the big long wall as I will need to put insulation in place. I cant do the insulation until I have filled the below ground cavity with concrete,  I cant fill till the ends of the wall are closed, I cant close them till the steel work is in. I wonder if I could just bash on and leave the wall ties hanging on the outer course and push the insulation over them? Only thing is it might be impossible to fit the retaning clips to keep it tight against the inner skin with only a 25mm gap!
oh and I am 10mm high at the back of the long wall, everone I have spoken to says that is nothing, but being me I am going to steal 1mm over the next 10 courses to get it right. chances are though once it settles the 10mm could come or go!




Wednesday, 16 April 2014

monday14april

Back from holidays and now the
proud owner of 4000 bricks and 700 blocks!
With some help from Barrie I got a cocourse of brick down. 
The driveway and half the back garden are full of bricks and blocks,  I now have to order the insulation for the 100 mm cavity,  have just realised it will take up same space as 4000 bricks! 

Tuesday, 1 April 2014

bricks and blocks in place

A good lot of bricks and blocks are now in place , thanks to much help from Tom and Barrie. 



Up to date state of play



a few days later

The bricks and blocks for the underbuilding arrived from Jewson. You might spot the schoolboy error in the picture below!
Got it? yes! That's 2 packs of 140mm dense concrete blocks
The fist one was swung off by thehiab and carefull placed at the end of thr drive, the driver asked where I wanted the next one. "Just stick it on top" I said, these things weigh in at 28kg each! Getting the top ones down is not a lot of fun!

Tuesday, 25 March 2014

start!

The house extension has started after neary a year in the planning stage!
We cut the first sod on Monday 3 March so this is a wee bit late and I am playing catch up!
I hope to document the build for all to see, which should also serve as an incentive for me to actually get things done!
Having never blogged any thing before it might take some attempts to get it going but here goes!
day 1 was a hoot
 Ewen C and Tom were round to help, machines hired from Jewson. I managed to drop the keys for the digger way down into the engine!


The founds got dug and all was well.



The kids even got a shot of the digger and dumper


Concrete booked for tuesday. I failed to realise the importance of notifing building control! They really need to come out and look into the holes! Said they couldn`t come till thursday. After a bit of sweet talking the nice lady agreed to come on tuesday afternoon.
 She was no sooner away than the concrete arrived!

 
founds full of concrete

rather than using skips I got this guy with a clamshell crab, takes 15 tonnes at a time and I
 much more cost effective. Had a large pile of dirt on front garden though! Told the kids it was the lenzie dry ski slope!