Monday, 30 April 2018

Been ages since update! That doesnt mean nothing has been happening!
Triangular window which was supplied wrong is now fitted.


Lead flashing to roof lights now in place with fleese natting betewwm lead and glass to mitigate risk of thefmal shock


Insulation to inside complete


Drains for utility room and shower room installed.




Slightly unorthodox testing, couldnt seal both ends as no easy access to existing vent stack , so stopped up in manhole before  the road and filled system with water. After 1 hour the water had not dropped even a millimetre so recon all seals are water tight!

Monday, 5 February 2018

A spot of gardening to make access for roof glazing.

Protection in place for expensive roof!





And here it is...... GLASS!!!


Saturday, 27 January 2018

Adjustment to roof upstand to accomodate odd leg tripple glazing units. Sarnsfill guys got it wrong so they are coming  back to extend the membrane further over the upstand. The odd leg of the glass will sit on top of the membrane, the other two should take it down and under thus providing a good seal

Wednesday, 17 January 2018


Started to fit roof and wall insulation.
Garage floor prepared for dpm then concrete


Volumetric delivery arrives!

Much shoveling and sufficient reinforceing

Floated smooth!




Friday, 12 January 2018

This is what 2 grand of insulation looks like!


Garage