Tuesday 21 November 2017

Doors and widows arrive manually us trial!







And have to be carried manually through garage to back of house

Then fitted!

All installed except for triangle window which is unforunately wrong size!




Tuesday 10 October 2017

The begining of an outside wall! This is where the back door goes.






Type1 laid and compacted by lunch time!

Friday 29 September 2017

15 tonnes of type1 ordered for sat morn, arrived 1 day early!!

Friday 22 September 2017

Progress to date, diagonal brace for steel work, granite plinth to take sliding doors. Timber round all windows.
Tonight was shutter work for plinth for back door but run out of light!


Also, now have garage door!

Saturday 22 July 2017

Just when I thought I had seen the last brick!
The time  has come to specify doors and windows for back of house. Departing from original drawings, bifolds are being replaced by sliders.  If we go for Internorm, which is looking likely, they are nearly 200mm thick! That's much more than a single brick which was provided from foundation up. Have now excavated back to top of foundation to brick up double thickness, 2 bricks!


Saturday 8 July 2017

Thursday 29 June 2017

Tuesday 7 February 2017

Progress  has started again!
Roof beams are in for large part of back roof, still cutting in cavity trays  before installation of small part of roof.