Friday 28 August 2015

Diminishing trusses now up. Change in methodology, instead of stripping existing roof decking before  trusses they are installed on top of decking and membrane, adequately nailed to existing trusses below. When all is waterproof then the old roof decking will be cut away from inside.


Thursday 20 August 2015

Bricks are up to apex at cable and trimmed to same profile as trusses.

Monday 17 August 2015

The last brick!!!!

Just need to trim to a triangle them bring the blockwork up to same
 height.......then ROOF!!!!!!!

Thursday 13 August 2015

The gable apex is creeping up, decision is to build outer brick full height and trim to correct profile then do same again with block work.

The kids have been away most of the summer so have been little help, though Rona did help with the roof trussses and they both unloaded trailer of 400 extra bricks!!

a visitor from next door came to check on progress and ensure all was being done to correct standards!






Saturday 1 August 2015

Wall plate and roof trusses are up! End truss still to be fixed in place once gable is bricked..... then roof!!!!!