Monday 29 September 2014

Couple more courses up at front.  More excitingly is the steel for the roof valley on the new bit at the back is up!  It has been kicking about the site for months!  It has its own neat pad stone to spread the load over the thermal blocks.  I need now to do pad stones and steel for the upstairs back wall.


Saturday 27 September 2014

Not updated for while as not much has been happening. The brick work is progressing and I went and got a lintel to cut up to use as pad stones to bear the steels in the new block wall and the exisying house wall.
The pile of bricks in the driveway is diminishing so thats s good sign!