Type1 compacted for garage floor and lights installed!
Vent pipes to outside wall installed.
Wednesday, 27 July 2016
After long absence game is on again!
Ducts installed to take under floor vents from existing house to new gable wall.
Thursday, 7 January 2016
Worktop now installed. Have purchased a desk grommet to put cables through so that electrical items can be used without having the cable trailing over the front. Now busy with gloss paint on skirting, facings and doors.
Wednesday, 6 January 2016
The back room of upstairs is now nearly complete, just the woodwork to gloss, inulation in loft space to do and mount TV on wall with single socket bestide it for power.